Accuracy
The most accurate site analysis
The most accurate site analysis
on the market.
Nothing you don't need. Every number traces to a source, and the model is validated against observed results.
r = 0.84
Validated model
Correlation between modeled and observed utilization.
Monthly
Tariffs verified at the source
Confirmed with the serving utility and refreshed every month. Never scraped averages.
Ours
Demand from real sessions
Utilization modeled on charging databases we built ourselves, not passing-traffic guesses.
100%
Reviewed by a person
Every L3 report is checked by a person before it reaches you.
What you get
Hard numbers
Hard numbers
you can count on.
The verdict, the return, the payback and ten years of cash flow. On the site's real tariff and real demand. One page. No filler.
GO
Sample report
Travel center · 6 DC fast ports · 150 kW
Clears the 9% hurdle. Build it. · Interstate exit, Texas · 10-year hold
NPV (the verdict)
+$0
✓ clears the 9% hurdle
IRR (the ranker)
0.0%
vs 9% cost of capital
Payback (the gut check)
0.0 yrs
nominal · of 10-yr asset life
Net investment
$0
equipment + install, incentives netted out
Profitability index
0.00
NPV per $ invested · Go at 0.25 or above
Discounted payback
0.0 yrs
at 9% discount rate
Utilization projection0.0% year-5 utilization
Per-charger utilization over the 10-year hold. A ramp to plateau: rises fast early, then saturates as the site matures. Per-charger utilization 15% threshold
Pre-tax project cash flows · $K · every figure traces to a sourceSample report. Figures are illustrative.
Optimize
A Hold can
A Hold can
become a Go.
The model re-solves price, port count and configuration for the site. One click, and you see what the site could earn if you build it right.
Travel center · DC fastHold
$12,500
10-year NPV after a 9% hurdle
Price$0.28/kWh
Ports4
Power150 kW
Re-solved by the model: +$200,300 available.
Build it.
Or don't.
Either way, you'll know first.
Reports are decision-support estimates to inform a site decision, not financial advice.